PROJECTS > Honduras Bulk Handling Dock Marine Structures Project

Honduras Bulk Handling Dock Marine Structures Project

  • Honduras PILOTES Project (9).JPG

Project Overview: 

This project is the construction structure of the Honduras terminal. The customer is a direct terminal and is purchased through an intermediate contractor. The pipe is a 40- meter long pipe with a total of 1400 tons. This project middlemen have branches in the world, and the managers of the Chinese branch are responsible for the final inspection and confirmation of the supplier. After two months of negotiation , the customer finally selected our company and sent professional engineers to the factory to start manufacture supervision of the whole process. After the supervision passed, this order was finally shipped smoothly.

Specification:

图片1.png

Honduras PILOTES Project (1)_1.JPG

Honduras PILOTES Project (2).JPGHonduras PILOTES Project (2)_1.JPGHonduras PILOTES Project (3).JPGHonduras PILOTES Project (4).JPGHonduras PILOTES Project (3)_1.JPGHonduras PILOTES Project (5).JPGHonduras PILOTES Project (6).JPGHonduras PILOTES Project (5)_1.JPGHonduras PILOTES Project (7).JPGHonduras PILOTES Project (6)_1.JPG

Honduras PILOTES Project (9).JPG

Honduras PILOTES Project (1).JPG